| TOTAL TIME: | 6,478 |
| LEFT ENGINE: | "0" Since Overhaul by Vector Aerospace |
| RIGHT ENGINE: | "0" Since Overhaul by Vector Aerospace |
| AVIONICS: |
| Honeywell 3 Tube EFIS |
| Honeywell FZ-500 Flight Director |
| Dual Honeywell 850 Nav/Comms |
| Dual Honeywell 850 ADF |
| Dual Collins DME-42 |
| Dual Honeywell XS-850 |
| Primus 650 Radar |
| King KHF-950 |
| Collins ALT-55B |
| GNS-XLS FMS |
| Loral GA100 CVR |
| TCAS II |
| Standby Gyro |
| Honeywell SPZ-500 A/P |
| OPTIONAL EQUIPMENT: |
| RVSM |
| TAWS |
| Freon Air |
| Artex 406 ELT |
| 2 Owner Aircraft |
| Complete Logs |
| CESCOM |
| Aircraft Avionics & Airframe on PROPARTS |
EXTERIOR: 12/2005
INTERIOR: 12/2005
Phase 1-4: January 2010, Phase 5: March 2008
ALL SPECIFICATIONS SUBJECT TO VERIFICATION UPON INSPECTION
$2,395,000
![]()
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |